- Owner: Community Services Daniel Island POA
- Cost: $ 2,358,418
- Completion Date: November 2020
Scope of Services:
- Installation of a Marsh Boardwalk (112’); Dock # 1 Rebuild (200’) Pier Head Office (36 X 60) (24 X 36 Covered, Pier Head (20 X 26) and 200’ Floating Docks.
- Installation of Dock # 2 (254’) Boardwalk; (30’ X 52’ Pier Head) (24’ X 36” Covered Portion); Three sets of floating docks (332’ each) with a total 996’ of Marina.