- Owner: South Carolina Ports Authority
- Cost: $3,668,875
- Completion Date: In Progress
Tidewater Road Bridge Extension
|
Construction of 480’ long flat slab bridge and associated road work to tie Tidewater Bridge to existing Tidewater Road. 480’ long flat slab bridge founded on 24” concrete piles. Tie in new Tidewater Road access from Port Access Road to existing Tidewater Road. Approach slab and relieving platform at bridge / roadway transition. Bridge work associated with new Hugh Leatherman Terminal. |